slide5The programmed cranes are a simple system used, in the main, for handling large pieces (such as, for example, bus and truck chassis) in areas with low production runs.

Maximum production with programmed crane plants is 8 to 10 pieces per hour, but it is also possible to increase this by simultaneously loading several pieces onto one skid.